Skip to content
SUNCAA SUN CHANG CORPORATIONInitial assessment 中文

INDUSTRIAL ARCHITECTURE × PCM

Five integrated services, from feasibility to operational handover.

Select a single scope or an integrated engagement based on site conditions, manufacturing requirements, investment goals and project stage.

01 / CORE SERVICES

Five core services

Each service supports a defined owner decision and deliverable. Scopes may be commissioned independently or connected as an integrated project-management path.

01 / FEASIBILITY

Construction feasibility assessment

Integrates land, regulations, capacity, budget and schedule before site acquisition, expansion or investment approval.

Typical outputs: feasibility report, concept plan, budget and schedule
02 / DESIGN & BIM

Architectural design and BIM coordination

Coordinates architecture, structure, MEP and manufacturing-process interfaces into buildable and tender-ready documents.

Typical outputs: design drawings, BIM coordination and interface records
03 / PROCUREMENT

Tender advisory and cost optimization

Establishes consistent tender scopes and comparison criteria for contractor selection, negotiation and value engineering.

Typical outputs: tender documents, bid comparison and procurement advice
04 / SITE REVIEW

Key construction supervision and quality review

Uses inspection gates, site records and scheduled reporting to control construction quality and design deviation.

Typical outputs: inspection records, issue tracking and progress reports
05 / CARBON & ESG

Construction carbon footprint and reduction strategy

Brings materials, energy use, emissions and certification requirements into design and construction decisions.

Typical outputs: carbon-data baseline, reduction plan and certification coordination

02 / PROJECT PATH

Five decision gates

The scope changes with each project, but the sequence remains clear: define the objective, then progress through design, procurement, construction and handover.

  1. 01 / DEFINE

    Confirm objectives

    Site, capacity, budget, schedule and operating constraints.

  2. 02 / PLAN

    Build the plan

    Layout, regulations, scope and investment conditions.

  3. 03 / DESIGN

    Complete design

    Architecture, structure, MEP, process and BIM coordination.

  4. 04 / DELIVER

    Tender and build

    Procurement, negotiation, interfaces and quality review.

  5. 05 / HANDOVER

    Handover for operation

    Acceptance, records, carbon data and improvement basis.

03 / DELIVERABLES

Outputs tied to decisions

This page lists common output types. Final depth, responsibilities and contracting entity are confirmed in project-specific agreements.

01

Decision information

Feasibility, budget, schedule and risk assessment.

02

Design documents

Drawings, BIM and multidisciplinary coordination records.

03

Procurement basis

Tender scope, contractor comparison and negotiation advice.

04

Quality and carbon records

Construction reviews, issue tracking and reduction data.

START A PROJECT

Begin with the site and your requirements.

Share the project location, industry, current phase and primary constraints. We will identify the most appropriate starting point.
Request an initial assessment ↗
Scroll to Top